The KUNG LONG WP 9-12 LONG Lead Acid Battery is a top choice for safety-critical applications. With a nominal voltage of 12V and a capacity of 9Ah, this sealed lead-acid battery is ideal for high-current and standby applications. It delivers 36 watts per cell during a 15-minute discharge period, ensuring dependable power. The battery’s maintenance-free design and robust performance make it suitable for alarm systems and uninterruptible power supplies. Its compact size and low weight enhance its versatility and ease of use.
Key Features
- Voltage: 12 V
- Capacity: 9 Ah
- Maintenance-Free Design
- High-Current and Standby Applications
- 36 Watts per Cell for 15-Minute Discharge
- Compact Dimensions: 151 x 65 x 94 mm
- Weight: 2.7 kg
- Sealed Lead-Acid Technology
- Connector: 6.3 mm
Design Features
- Sealed for Safety
- Compact and Lightweight
- Maintenance-Free Operation
- Certified by VDS
- High Discharge Power
Outbound Links
Internal Links





Reviews
There are no reviews yet.