Shop Eagle Systems for top-quality power tools, UPS systems, and essential equipment. Discover premium products for power stabilization and more in our store. Dismiss

Skip to content
    • Fast Delivery Across Egypt
    • @
    • 6.00AM TO 10.00PM
    • 01015880830
    • WhatsApp
  • Express Delivery - Free Return - Cash on Delivery Available
  • Express Delivery - Free Return - Cash on Delivery Available
Eagle Systems For Import and ExportEagle Systems For Import and Export
  • Login
  • Cart
    • No products in the cart.

      Return to shop

  • Cart

    No products in the cart.

    Return to shop

  • CATEGORIES
    • UPS Systems
      • Comms Room UPS to 20kVA
      • Data centres 10-800kVA
      • Extended Backup Times
      • Industrial/ Marine Systems
      • Models by Size 500VA-800kVA
      • PCs and Servers to 1.5kVA
      • Rack mount 500VA-40kVA
      • Servers and Networks to 3kVA
      • Single Phase 400VA-20kVA
      • Telecoms UPS
      • Three Phase 10-800kVA
    • Power Distribution Units (PDUs)
    • GENERATORS
      • PRIME AND STANDBY POWER GENERATORS
    • ELECTRICAL CABLES & WIRES
      • Electrical Power & Industrial Cables
      • Single Core Cable
      • AV Cables
      • Cable Joints & Cable Sleeving
      • Networking & Coaxial Cables
      • Wire to Board Cables & Ribbon Cable
    • POWER SUPPLIES, TRANSFORMERS & STABILIZERS
      • Power Supplies
      • Transformers
    • ENERGY MANAGEMENT SOLUTIONS
      • Active Harmonic Filters
      • Inverter Drives
      • Power Factor Correction Systems
    • TEST & MEASUREMENT AND ACCESSORIES
      • Bench Power Supplies & Sources
      • Electrical Test & Measurement
      • Environmental Test & Measurement
      • Multimeters & Accessories
      • Network Test & Measurement
      • Pressure Test & Measurement
      • Temperature Test & Measurement
    • SCIENCE LAB EQUIOMENT
      • Lab Equipment
      • Scientific Measuring and Testing
      • Weight & Force Test & Measurement
    • MEDICAL SUPPORTING EQUIPMENT
    • Battery Monitors and Testers
    • Battery Transition Boxes
    • Centralized Battery Systems
    • UPS Batteries
    • UPS Battery Kits
    • UPS Battery Extension Packs
    • AC Inverters
    • AC Inverters/DC Chargers
  • Home
  • About Us
  • Surveys
    • Energy Efficiency
    • Power quality
    • Power Protection and Stabilizers
    • Ups&Generator Surveys Health Check and Installation
  • Case Study
  • Contact Us
  • Request for Quotation
  • arArabic
Home / Products tagged “Long lead-acid battery”
Filter

Showing all 2 results

Product categories
  • Battery Transition Boxes (1)
  • Centralized Battery Systems (15)
  • Power Distribution Units (PDUs) (14)
  • POWER SUPPLIES, TRANSFORMERS & STABILIZERS (63)
    • Voltage Stabilizers (63)
      • CHINT Voltage Stabilizers (4)
      • Elco Voltage stabilizers (7)
      • LiOA Voltage stabilizers (21)
      • Power Wave Voltage Stabilizers (16)
      • Ultra Voltage stabilizers (9)
  • SCIENCE LAB EQUIOMENT (55)
    • Lab Equipment (54)
      • Adwa-Romania (26)
      • milwaukee - Europe (28)
    • Measuring Instruments (54)
  • UPS Batteries (76)
    • Battery (76)
      • Battery - Ultracell (11)
      • Battery - YUASA (9)
      • Battery Chargers (7)
      • CSB (6)
      • GIGA (5)
      • LONG (5)
      • NPP Batteries (11)
      • SAITE Battaries Vitname (10)
      • ULTRA (11)
  • UPS Battery Extension Packs (12)
  • UPS Battery Kits (1)
  • UPS Systems (85)
    • Comms Room UPS to 20kVA (36)
    • Data centres 10-800kVA (18)
    • Extended Backup Times (9)
    • Industrial/ Marine Systems (30)
    • Models by Size 500VA-800kVA (40)
    • PCs and Servers to 1.5kVA (18)
    • Rack mount 500VA-40kVA (5)
    • Servers and Networks to 3kVA (15)
    • Single Phase 400VA-20kVA (28)
    • Telecoms UPS (26)
    • Three Phase 10-800kVA (12)
    • Uninterruptible Power Supply - UPS (85)
      • ULTRA UPS (5)
      • UPS - APC Schneider (32)
      • UPS - DALTON (9)
      • UPS - DELTA TURKEY (16)
      • UPS -JAVAC Belgium (18)
      • UPS SATRON (5)
WP 12-12 Long Lead-Acid Battery, 12V, 12Ah, Rechargeable
Quick View

Battery

WP 12-12 Long Rechargeable Lead-Acid Battery, 12V, 12Ah

WP 18-12 Long Lead-Acid Battery, 12V, 18Ah, Rechargeable
Quick View

Battery

WP 18-12 Long Rechargeable Lead-Acid Battery, 12V, 18Ah

EAGLE SYSTEMS FOR SUPPLIES

Central Axis, Ali Eldin October City, Giza Government EGYPT

Tel: 01015880830
        01006255727

Our Office In Bur Dubai, Dubai, United Arab Imarates

ALFARIDA ENGINEERING EQUIPMENT TRADING CO.L.L.C

Tel: +971505257174

 

 

Quick Links
  • blog
  • Privacy Policy
  • Payment Methods Accepted
  • Refund and Returns Policy
  • Contact Us
—-
  • Home
  • About Us
  • Surveys
    • Energy Efficiency
    • Power quality
    • Power Protection and Stabilizers
    • Ups&Generator Surveys Health Check and Installation
  • Case Study
  • Contact Us
  • Request for Quotation
Visa
Stripe
MasterCard
Cash On Delivery
Copyright 2026 © EAGLE SYSTEM EGYPT Powered by smart2group
  • Home
  • About Us
  • Surveys
    • Energy Efficiency
    • Power quality
    • Power Protection and Stabilizers
    • Ups&Generator Surveys Health Check and Installation
  • Case Study
  • Contact Us
  • Request for Quotation
  • Login

Login

Are you human? Please solve:Captcha


Lost your password?

WhatsApp us