- The WP 18-12 Long Rechargeable Lead-Acid Battery is designed to provide reliable power in safety applications such as alarm systems and uninterruptible power supplies (UPS). This battery offers 12V and 18Ah capacity, ensuring optimal performance. It features low internal resistance for efficient energy usage and is certified by the Association of German Property Insurers (VDS) for safety. With dimensions of 167 x 180 x 75 mm, the battery is compact yet powerful, making it ideal for both home and industrial power backup solutions.
- Key Features:
- Rechargeable lead-acid battery
- 12V, 18Ah capacity
- Compact design: 167 x 180 x 75 mm
- Low internal resistance for efficient power output
- VDS-certified for safety
- Design Features:
- Designed for critical safety applications
- Suitable for alarm systems and uninterruptible power supplies (UPS)
- Durable and long-lasting construction
- High charging efficiency and excellent energy retention
- Outbound Links:
- Link to VDS certification details
- Link to safety regulations for lead-acid batteries
- Internal Links:
- Link to other LONG battery products
- Link to uninterruptible power supplies (UPS) category





Reviews
There are no reviews yet.